The risk of poor workmanship and the cost associated with it is a big factor when you are looking to screed a floor. That’s why the first and most important step when looking to screed a floor is choosing the right screeding contractor.
The ideal screeding contractor should have:
When it comes to fast drying liquid screed, Cemfloor by McGraths Cong are industry leaders with industry experience surpassing 50 years and more importantly McGraths Limestone have 15+ years’ experience specifically in the liquid screed industry. We know that to guarantee quality and consistency a skilled work force is of the upmost importance and therefore all Cemfloor distributors are carefully vetted and chosen. We also make sure that our distributors receive full time technical support and continuous training as required.
To make sure we deliver the highest standards, we have developed a step by step process on how we screed a floor to ensure the perfect finish:
We offer 3 types of screed
As we offer 3 different types of screed, site preparation differs for each one
Bonded screed:
Floating screed:
Screed with underfloor heating:
Prior to the pouring of the screed you must ensure that the building is fully weather tight with all windows and doors fitted. If not, polythene or plywood should be used to temporally block these openings. When the Cemfloor truck arrives on site, the mixing drum is put at full speed for a minute to increase the flow. A flow test is then carried out to make there is a flow of between 230mm and 260mm. If the correct flow has been achieved the screed can be pumped into the building, this is done at pre-arranged heights which have been determined by the engineer on site. Once the Cemfloor has been pumped into the building it is then dappled twice in both directions 90 degrees to each other. When this has been complete you must spray a light mist of Cemfloor evaporation control evenly over the entire surface of the screed. To ensure that the Cemfloor cures properly all openings must be completely covered.
After the liquid screed has been installed it is time for the finishing touches. All windows and doors should be opened after 24 hours to make sure the building is vented. It is recommended that this is to be done every day until the heating has been commissioned.One of the benefits of Cemfloor screeds is that there is no need for any sanding before tiling, just make sure you have removed any debris or spillages. Finally, before you fix any floor covering to Cemfloor with underfloor heating, make sure your heating contractor has fully commissioned the heating system. Once this has been done a moisture test must be taken for the fixing of timber floor and vinyls.
If you wish to learn more about Cemfloor, Contact us today