Inititial Brief

The project was originally specified for a 75mm traditional sand and cement screed but switched to Cemfloor to meet UV 0.15 W/m²K.

Case Study Springmoor Grange School

Springmoor Grange School, Spennymoor Durham

Main Contractor  ESH Construction

Cemfloor Installed by Integrated Flooring Technologies (IFT) North East Branch

Due to open in September 2024, the new Springmoor Grange School will host 630 Primary School pupils, alongside a 52-place nursery unit for children aged two and older. 

Designed and funded by Durham County Council, with main contract works carried out by ESH Construction, the school will be located on the site of the former Tudhoe Grange Comprehensive School and has been hailed as a significant investment in accommodating demand for school places and giving children the best start in life. 

Springmoor Grange School 2

The project was originally specified for a 75mm traditional sand and cement screed but switched to Cemfloor to meet UV 0.15 W/m²K.

Thanks to the benefits of Cemfloor, including its exceptional thermal conductivity, and the fact that it can be installed at thinner sections compared to Traditional Screeds, IFT expertly installed 50mm Cemfloor onto EPS150 & PIR Insulation, with separating layer and DPM. 

The Cemfloor was supplied by Aggregate Industries’ Gateshead plant.

      .     Springmoor Grange School 3

 

Springmoor Grange School

next-step

Ready to take the next step?

Just fill out the form in as much detail as you can, and an expert will be in
touch within 24 hours.