IFT (Integrated Flooring Technologies) installed 3,700m2 of Cemfloor, the chosen screed for the project, which Holcim supplied.
With a large-scale 3,700 m2 installation, precision and speed were critical. The project required: Tight turnaround times to keep the build on schedule, Seamless coordination between multiple stakeholders High-performance screed capable of handling intensive campus usage.
The Cemfloor® Solution
IFT, servicing main contractor Balfour Beatty, selected Cemfloor® C25, supplied by Holcim, for its reliability, strength, and rapid installation benefits:
• Fast-track installation – faster pour rates for large areas,
• Quick drying times – allowing early access for followon trades,
• Exceptional strength & durability – designed for heavy foot traffic. Consistent, smooth finish – ideal for high-quality floor coverings.
Outcome
The Cemfloor® solution ensured flawless delivery across 3,700 m2 of screeded floor, supporting Balfour